VI MS 3000 • 9095-032A
CONTENTS
CONTENTS
FOREWORD V
CONTENTS VI
SURVEY OF ILLUSTRATIONS VII
EC DECLARATION OF CONFORMITY VIII
MEANING OF THE SYMBOLS USED IX
1. TECHNICAL DETAILS 1-1
1.1 General 1-1
1.2 Electrical installation 1-5
1.3 Chassis 1-5
1.4 Platform construction, loading diagrams
and EMOS program numbers 1-6
1.4.1 Maximum loading platform construction 1-6
1.4.2 Maximum eccentrically loading
platform construction 1-6
1.5 Anchor forces 1-7
2. COMPONENT DESCRIPTION 2-1
2.1 General description 2-1
3. SAFETY 3-1
3.1 General 3-1
3.2 Safety prior to use 3-1
3.3 Safety in use 3-1
3.4 Safety after use 3-3
3.5 Built-in and additional safety features 3-3
4. TRANSPORT 4-1
4.1 Repositioning on the building site 4-2
4.2 Repositioning with a crane 4-3
5. CONTROL COMPONENTS 5-1
5.1 Power supply socket for the platform 5-1
5.2 Platform control box 5-2
6. ASSEMBLY AND ANCHORING 6-1
6.1 Preparation for assembly 6-2
6.2 Ground support 6-3
6.3 Positioning the mast climbing
work platform 6-4
6.3.1 Positioning the mast climbing
work platform 6-5
6.4 Assembly of the mast 6-7
6.5 Anchoring the mast 6-10
6.6 Adjusting the platform width 6-12
6.7 Adjusting the EMOS system 6-14
6.8 Lightning protection 6-14
7. OPERATION 7-1
7.1 General 7-1
7.2 Preparation 7-1
7.3 Testing 7-3
7.4 Brake test 7-3
7.5 Operation from the platform 7-4
7.6 Operation in an emergency situation 7-4
8. DISASSEMBLY AND TRANSPORT 8-1
9. MAINTENANCE 9-1
9.1 General 9-1
9.2 Maintenance intervals 9-1
9.3 The motor brake 9-3
9.3.1 Operation 9-3
9.3.2 Maintenance 9-4
10. MALFUNCTION ANALYSIS 10-1
11. MACHINE DISPOSAL 11-1
12. LIST OF KEYWORDS 12-1
APPENDICES 1