ASSEMBLY AND ANCHORING
6-8 MS 3000 • 9095-032A
2. Set the main switch in position I or II
(the position depends on the
direction of phase rotation of the
power supply). If the display shows
code 02 and the phaselight on the
phaseguard relay does not burn, set
the main switch in the other
position. The display must show
code 00 and the phase light will be
burning.
3. When the mast climbing work
platform is delivered it is in the
buffer. In order to remove the mobile
work platform out of the buffer, carry
out the following procedure:
1 Press the push-button "reset
positioning" and keep it pushed
in.
2 Press the push-button "UP".
4. The mast climbing work platform is
raised and lowered by pressing the
UP and DOWN push buttons. When
the push-button is released, the
mast climbing work platform stops.
In addition, an emergency stop
push-button is provided. When this
button is pushed, the power of the
motors will be shut off.
5. Check that the proximity switch is
mounted.
6. Load the platform with mast
elements. Using a fork-lift truck or
crane if neccesasary. Ensure that
the maximum loading permitted
during assembly is not exceeded.
Fig.6-12 Proximity switch
Fig.6-11 Control buttons
Fig.6-10 Main switch