EasyManua.ls Logo

Honeywell Dolphin 75e - Mounting the Ebase

Honeywell Dolphin 75e
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 - 7
Mounting the eBase
Set the base on a dry, stable surface, such as a desktop or workbench near an electrical outlet. Be sure to provide enough
workspace with good lighting for the user to view and operate the Dolphin terminal while it is in the base. When choosing a
mounting location, bear in mind that the location must allow users' easy access to the Auxiliary Battery Well and the back panel
of the eBase where the USB port, Ethernet port, and power jack are located.
Optional DIN Rail Mount
A DIN rail (7.5 X 35 mm) may be installed on the bottom of the base to provide the optional security of mounting the base to
a flat horizontal surface with hardware.
Additional Hardware
DIN Rail, Qty. 1
3/16 in. dia x 5/8 in. long pan head screw, Qty. 2
1/2 in. OD x 7/32 in. ID x 3/64 in. thick washer, Qty. 4
3/16 in. dia nut, Qty. 2
Note: The items listed above are for reference only. Final hardware selection is dependent on the material type and
thickness of the mounting surface.
Installing the DIN Rail
1. Slide the DIN rail into the slot along the bottom panel of the base.
2. Use the appropriate hardware to secure the DIN rail to the desk or flat surface.
DIN Rail Slot

Table of Contents

Other manuals for Honeywell Dolphin 75e

Related product manuals