EasyManua.ls Logo

HP Jet Fusion 5200 Series - Page 151

HP Jet Fusion 5200 Series
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Connect the tube from the external equipment and close it with the clamp.
IMPORTANT: Do not forget the rubber.
3. Use a multimeter to measure the continuity between the processing station structure and the
external equipment structure. The measurement should be less than 100 Ω.
IMPORTANT: The processing station and the external equipment should both be disconnected
fr
om the mains supply before the measurement.
4. If you have a material loading tank or external tank connected, remove it.
5. Place an empty material loading tank and close the lid.
TIP: When closing the lid, if you find that it interferes with one of the blades inside the material
loading t
ank, rotate the material loading tank on its axis by about 60° and try again; do not turn the
lid.
6. Tap Continue on the front panel to fill the material loading tank. The process will stop automatically
once the material loading tank is full.
7. If you want to fill more material loading tanks, declare that in the front panel and replace the full
material loading tank by an empty one. Close the full tank with a loading lid or a storage lid.
144 Chapter 11 Hardware maintenance

Table of Contents

Related product manuals