EasyManua.ls Logo

HP Synergy 480 Gen10 - Installing the P416 Ie-M Controller Mezzanine Option

HP Synergy 480 Gen10
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the P416ie-m Controller mezzanine optionInstalling the P416ie-m Controller mezzanine option
IMPORTANT:IMPORTANT:
For more information about the association between the mezzanine bay and the interconnect bays, see the HPE Synergy
12000 Frame Setup and Installation Guide (https://www.hpe.com/info/synergy-docshttps://www.hpe.com/info/synergy-docs). Where you install the mezzanine
card determines where you need to install the interconnect modules.
ProcedureProcedure
1. Power down the compute module.
2. Remove the compute module.
3. Place the compute module on a flat, level work surface.
4. Remove the access panel .
5. Locate the appropriate mezzanine connector. To locate the connector, see System board components.
6. Remove the front panel/drive cage assembly .
7. Install the mezzanine card. Press firmly on the PRESS HEREPRESS HERE label above the mezzanine connector to seat the card.
8. Install and route the HPE SAS Cable for the P416ie-m SR Gen10 Controller from the premium backplane to the HPE Smart Array
P416ie-m Controller Port 3i of the mezzanine card in mezzanine 1.
Installing the P416ie-m Controller mezzanine option 58

Table of Contents

Related product manuals