Preparing the Preparing the compute modulecompute module for operation for operation
ProcedureProcedure
1. Install any options or cables previously removed to access the TPM connector.
2. Install the access panel.
3. Do one of the following:
Slide or install the server into the rack.
Install the compute module into the frame.
4. Power up the compute module.
a. Connect the power cords (rack and tower servers).
b. Press the Power On/Standby button.
Preparing the compute module for operation 98