b. Install the appropriate retention clip onto the air bale.
Install the clip that supports your configuration. Primary, secondary, and tertiary positions are shown.
8.
Install high-performance heatsinks.
9.
Install the air bale.
10.
Remove the rear wall blank.
The secondary rear wall blank is shown.
Hardware options installation
134