EasyManua.ls Logo

Huawei OptiX OSN 3500 - Installation Method; Install Mounting Ears on the Fiber Management Tray; Spooling Fibers in the Fiber Management Tray

Huawei OptiX OSN 3500
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
2
2
1
1
Install mounting ears on the fiber management tray.
Secure the fiber management tray in the cabinet.
Phillips screwdriver
By default, the fiber management tray is installed in the lower part of the cabinet and is more than 50 mm
away from the subrack. The fiber management tray must also be more than 50 mm away from the air inlet
and outlet of the subrack. The fiber management tray can be installed in a cabinet that is not fully configured
with subracks, but future expansion will be affected due to reduced installation space in the cabinet.
Installation Method
c
With no attenuator used (the optical fibers connected to
the optical interface board are on the same side of the
cross-connect and timing board)
With no attenuator used (the optical fibers connected to
the optical interface board are on different sides of the
cross-connect and timing board)
With the attenuator used (the optical fibers connected to
the optical interface board are on the same side of the
cross-connect and timing board)
With the attenuator used (the optical fibers connected to
the optical interface board are on different sides of the
cross-connect and timing board)
Variable optical attenuator Variable optical attenuator
>50 mm
Spooling Fibers in the Fiber Management Tray
d
30±3 Kgf.cm
M6
12±1.2 Kgf.cm
M4
NOTE

Table of Contents

Other manuals for Huawei OptiX OSN 3500

Related product manuals