27 
Power output area 
Power switch area 
Power input area 
A  B 
• Installing and routing power cables – DC power distribution box (TN51PDU) 
  
X 
Y  Z 
Determine whether to install short-circuiting copper bars in the power input area according to the onsite 
situation: If the telecommunications room provides four current inputs, each of which is 63 A or greater, do 
not install short-circuiting copper bars. If the telecommunications room provides only two current inputs, 
each of which is 125 A or greater, install short-circuiting copper bars. 
• Installing short-circuiting copper bars onsite (optional)  
63 A 
a 
b 
c 
125 A (requiring short-circuiting copper bars) 
32 A (backup of the output power, which facilitates the customer to replace the 
circuit breaker for capacity expansion of other equipment) 
Black 
Blue 
Short-circuiting 
copper bar 
M6 screw 
a  b b a  a  b b a 
c 
Power output area 
Power switch area 
M6 one-hole 
OT terminal 
If short-circuiting copper bars are required, use125 A power cables whose cross-sectional area is 35 mm
2
 
and whose length does not exceed 25 m. In addition, use M6 one-hole OT terminals with the width of less 
than 15.5 mm. 
If short-circuiting copper bars are not required, use M6 two-hole OT terminals for the power cables with the 
cross-sectional areas of 16 mm
2
 and 25 mm
2
. 
a  b b a 
c 
a  b b a 
50±5 Kgf.cm 
M6 
When two 32 A power inputs are available in the telecommunications room, one cabinet can be configured with 
only one OptiX OSN 3500 III subrack. 
When four 32 A or two 63 A power inputs are available in the telecommunications room, one cabinet can be 
configured with two OptiX OSN 3500 III subracks, but the power consumption of each subrack must be less than 
1100 W. 