Route the optical fibers in the fiber cable trough of the column in the cabinet. If the two fiber holes do not
provide sufficient space for the optical fibers, you can route the optical fibers through the cable holes.
Bind the optical fibers using binding straps, and then bind the optical fibers onto the fixing plate using cable
ties properly so that the optical fibers can be removed freely. When routing the optical fibers, take proper
measures to avoid damage to the optical fiber connectors.
Connections Between Internal Optical Fibers
a
Route the fiber patch cords downwards along the fiber path on the right side of the cabinet and then into the subrack
through the corresponding cable trough. Route the fiber patch cords upwards through the cable trough below the
optical interface board. Insert the fiber connectors into the corresponding optical ports on the board.
2
Installing and Routing Internal Optical Fibers
Fiber connections between the SL16, the BPA, and
the DCU
Fiber connections between the SL16 and
the BA2
equipment A
NOTE
BOUT
BIN
OUT
IN
BPA
SL 16
OptiX OSN equipment A
POUT
PIN
OUT
IN
BPA
SL 16
OUT 1
IN 1
DCU
OUT 2
IN 2
BOUT
BIN
POUT
PIN
OUT 1
IN 1
DCU
OUT 2
IN 2
B
OptiX OSN equipment
OUT 1
IN 1
OUT
IN
BA 2
SL 16
OptiX OSN
OUT 2
IN 2
OUT
IN
BA 2 SL 16
OUT 1
IN 1
OUT 2
IN 2
OptiX OSN equipment B
When routing and installing fibers onsite, you need to clean fiber end faces. For detailed operations, see the multimedia
at the following website:
http://support.huawei.com/carrier/docview!docview?nid=DOC1000132657

Table of Contents

Other manuals for Huawei OptiX OSN 3500

Related product manuals