Home
Huawei
Network Hardware
OptiX OSN 3500
Page 69 (Installing Orderwire Phones)
Huawei OptiX OSN 3500 - Installing Orderwire Phones; Assembling the Orderwire Phone Base; Installing the Orderwire Phone
80 pages
Manual
To Next Page
To Next Page
To Previous Page
To Previous Page
Loading...
66
Installing
Orderw
ire
Phones
1
A
ssembling
the Orderw
ire Phone Base
2
Installing the
Orderwire P
hone
Set the ring sw
itch to "ON" and the dial
switch to "T
".
W
hen
instal
ling
an orderwire phone
,
ti
lt it
upwards to av
oid falloff.
30
±
3 Kgf.cm
M6
NOTE
68
70
Table of Contents
Main Page
Notice
2
Installation Process
3
Precautions
4
Electrostatic Discharge
4
Binding Cables
4
Checking before Installation
4
Tools for Installation
5
Cables
6
Instructions and Precautions for Handling Boards
7
Wearing ESD Gloves
7
Wearing an ESD Strap
7
Holding a Board Without Hand Protection
7
Introduction to the Optix OSN 3500 Equipment
8
Exterior of the Optix OSN 3500 III Subrack
8
Front View
8
Side View
8
Front View
9
Installing Components
10
Positions of the Installation Holes
10
Installing the Subrack
11
Checking the Power Jumpers on the Board
12
Checking Power Jumpers on the GSCC
12
Position of the Jumpers of the N1GSCC (Layout 1)
12
Position of the Jumpers of the N1GSCC (Layout 2)
12
Position of the Jumpers of the N3GSCC (Layout 1)
13
Position of the Jumpers of the N3GSCC (Layout 2)
13
Position of the Jumpers of the N4GSCC
14
Position of the Jumpers of the N6GSCC
14
Checking Jumpers on the AUX
15
Installing Cable Distribution Plates
16
Installing Fiber Management Trays
16
Exterior of the Fiber Management Tray
16
Installation Method
17
Install Mounting Ears on the Fiber Management Tray
17
Spooling Fibers in the Fiber Management Tray
17
Installing the SS61COA
18
Connections between Ports and Optical Fibers
18
Exterior of the SS61COA
18
Fiber Connections of the SS61COA
18
Installation Effectiveness
19
Cable Connections
20
Installing the SS62COA
21
Front View of the SS62COA
21
Fiber Connections of the SS62COA
21
Installation Procedure
22
Installing RPC Frames
23
Exterior of the RPC Frame
23
Installation Holes
23
Installing the DCM
25
Installing the UPM Power System
26
Installing Batteries
26
Installing the EPS75-4815AF Power System in the ETSI Cabinet
27
Cable Connection of the UPM
27
Installing and Routing Cables
28
Cable Holes on the Top of the N63E Cabinet
28
Cable Holes at the Bottom of the N63E Cabinet
28
Installing and Routing Power Cables and PGND Cables
29
Installing and Routing Power Cables – DC Power Distribution Box
29
Installing Short-Circuiting Copper Bars Onsite
30
Precautions for Installing the DC Power Distribution Box (TN51PDU)
31
PDU with the Front Panel
32
PDU Without the Front Panel
32
PDU with Short-Circuiting Copper Bars
32
Installing Short-Circuiting Copper Bars – DC Power Distribution Box
33
Connections between Power Cables
35
Installing and Routing Power Cables for the Subrack
41
Installing Power Cables for the N1PIU\N1PIUA
41
Installing Power Cables for the N1PIUB
41
Overhead Cabling
43
Underfloor Cabling
46
Installing and Routing Cabinet Indicator Cables
48
Indicator Ports of the Cabinet
48
Cable Connections and Installation Procedure
48
Installing and Routing Alarm Cables
49
Alarm Ports
49
E1/T1 Ports
50
Routing E1 Cables for the Lower Subrack
51
Routing E1 Cables for the Upper Subrack
52
Installing and Routing E3/T3/E4/STM-1 Cables
53
Route Ethernet Cables for the Lower Subrack
56
Installing and Routing if Cables
57
Board Ports
57
Precautions for Handling the Toggle Lever Switch
58
Turning on the Switch
58
Turning off the Switch
58
Precautions for Handling if Jumpers
58
Installing and Routing if Jumpers
59
Connections between if Cables
59
Installing and Routing External Clock Cables
61
Clock Ports
61
Installing and Routing Network Management Cables
62
Installing and Routing SDI Coaxial Cables
63
Ports on the VST4 Board
63
Installing SDI Coaxial Cables
63
Installing and Routing Cables for PCM Boards
64
Installing and Routing Cables for the Extended Subrack
65
Installing and Routing Optical Fibers
65
Installing and Routing External Optical Fibers
65
Installing and Routing Internal Optical Fibers
67
Connections between Internal Optical Fibers
67
Routing Optical Fibers between Boards
68
Installing Orderwire Phones
69
Assembling the Orderwire Phone Base
69
Installing the Orderwire Phone
69
Checking the Installation
70
Checking Installation Effectiveness
70
Checking Equipment Prior to Powering up
70
Checking the Subrack Power-On
71
Checking Optical Fiber Attenuation
72
Engineering Labels
73
Attaching Labels
73
Attaching Labels to Power Cables
73
Attaching Labels to Signal Cables
73
Common Engineering Labels
74
Assembling Cable Connectors
77
Assembling OT Terminals and Power Cables
77
Assembling Cord End Terminals and Power Cables
78
Other manuals for Huawei OptiX OSN 3500
Routine Maintenance
46 pages
Related product manuals
Huawei OptiX OSN 6800
92 pages
Huawei OptiX OSN 8800
92 pages
Huawei OptiX OSN 1500
46 pages
Huawei OptiX OSN 9560
48 pages
Huawei OptiX OSN 8800 T64
139 pages
Huawei OptiX OSN 8800 T32
139 pages
Huawei OptiX OSN 8800 T16
139 pages
Huawei OptiX RTN 910A
44 pages
Huawei OptiX RTN 950A
49 pages
Huawei OptiX PTN 3900
37 pages
Huawei OptiX RTN 600 ODU
100 pages
Huawei OptiX RTN PI-DC B10
7 pages