EasyManua.ls Logo

Huawei OptiX OSN 3500 - Page 34

Huawei OptiX OSN 3500
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Installing and Routing Power Cables DC Power Distribution Box (DPD100-2-8 PDU)
PDU with the front panel
PDU without the front panel
Power output area (A) Power output area (B)
Power input area (A) Power input area (B)
A1-4 (-)
B1-4 (-)
A1(+)
B1(+)
Do not install short-circuiting copper bars in the power output areas.
DANGER
Remove the front panel from the PDU before you install power cables and restore the front panel after you finish the
installation.
NOTE
Before the equipment is delivered, 4-in-1 short-circuiting copper bars and 4-in-1 horizontal short-circuiting copper
plates are installed in the power input area by default.
Power switch area
(A)
Power switch area
(B)
4-in-1 short-circuiting copper bar (left)
NEG (-)
4-in-1 short-circuiting copper bar (right)
NEG (-)
4-in-1 horizontal short-circuiting copper plates
RTN (+)
Power Distribution Guide for the Equipment
Whether to Install Short-
Circuiting Copper Bars
Power Input Power Output
Yes 2 x 100 A 4 x 32 A, 4 x 20 A

Table of Contents

Other manuals for Huawei OptiX OSN 3500

Related product manuals