EasyManua.ls Logo

IBM 6000 - Chapter 4. Installing; Detailed Installation Steps (SSR Task); IBM Storage Scale System 6000 System View; Rack Details

IBM 6000
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4. Installing
This chapter covers rack and rails installation specications and process. Also, nd the references about
conguration, IP addresses, and VLAN tag.
The Service Support Representatives (SSR) can refer to the ESS Install Complete Guide to perform a
hardware checkout and to set the management interface IP, BMC interface IP, and VLAN tag.
Note: An IBM intranet connection is required to access this content.
Note: Much of the information in this section is intended only for IBM authorized service providers.
Customers need to consult the terms of their warranty to determine the extent to which they must
attempt any IBM Storage Scale System 6000 maintenance.
Tasks to be done by the Customers or an IBM SSR are marked in this chapter.
Detailed installation steps (SSR task)
This section is intended for IBM authorized service personnel only.
IBM Storage Scale System 6000 system view
Components required to set up EMS
For information on the components required to set up EMS, see Before Installation (Sections 1 through 8)
on the IBM Worldwide Customized Installation Instructions (WCII) website.
IBM Storage Scale System 6000 system network connection diagram
For information on the IBM Storage Scale System 6000 network connection diagram, see Section 2.3.1
- ESS network connection diagrams on the IBM Worldwide Customized Installation Instructions (WCII)
website.
Technical and Delivery Assessments (TDAs)
For information on the Technical and Delivery Assessments (TDAs), see Section 3.1 - ESS - Technical and
Delivery Assessments (TDAs) on the IBM Worldwide Customized Installation Instructions (WCII) website.
Rack details
Prepare the rack for installation work
For information on preparing the rack for installation work, see Section 10.2 - Prepare the rack for
installation work on the IBM Worldwide Customized Installation Instructions (WCII) website.
Mark EIA locations for rail mounting
For information on verifying the position and installation of new system racks, see Section 10.3 - Mark EIA
locations for rail mounting on the IBM Worldwide Customized Installation Instructions (WCII) website.
Installing the management server in a rack
For the instructions about how to install an management server on a rack, see Installing the EMS server in
a rack and Planning for racks.
©
Copyright IBM Corp. 2023, 2024 41

Table of Contents

Related product manuals