EasyManua.ls Logo

IBM MTM 2145-SV1 - User Manual

IBM MTM 2145-SV1
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
IBM SAN Volume Controller
MTM 2145-SV1, 2147-SV1, 2145-12F, 2147-12F,
2145-24F, 2147-24F, 2145-92F, and 2147-92F
Hardware Installation Guide
GI13-4547-02
IBM

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the IBM MTM 2145-SV1 and is the answer not in the manual?

Summary

Chapter 1. Preparing to install the SAN Volume Controller

2145-SV1 Front Panel Overview

Describes the controls, indicators, and operator-information panel on the front of the 2145-SV1 node.

Chapter 2. Installing the SAN Volume Controller 2145-SV1 hardware

Preparing for Hardware Installation

Confirms required planning information and parts for hardware installation.

Installing the 2145-SV1 Node

Provides step-by-step procedures for installing support rails, the node in a rack, and cable management arms.

Chapter 3. Installing an optional 2 U SAS expansion enclosure

Chapter 4. Installing an optional 5 U SAS expansion enclosure

Safety and Physical Considerations for 2145-92 F

Covers safety notices, weight considerations, and component identification for the 2145-92F enclosure.

Installing the 2145-92 F Enclosure and Related Parts

Details unpacking, installing rails, enclosure, CMA, fascia, PSU, drives, modules, canisters, fans, FIB, SAS cables, and power.

Removing and Replacing 2145-92 F Components

Provides procedures for removing and replacing top cover, fascia, PSU, drives, modules, canister, fans, FIB, display, rails, SAS cable.

Chapter 5. Initializing the SAN Volume Controller 2145-SV1 system

Initializing System Using Technician Port

Guides the process of initializing the system by connecting to the technician port.

Summary

Chapter 1. Preparing to install the SAN Volume Controller

2145-SV1 Front Panel Overview

Describes the controls, indicators, and operator-information panel on the front of the 2145-SV1 node.

Chapter 2. Installing the SAN Volume Controller 2145-SV1 hardware

Preparing for Hardware Installation

Confirms required planning information and parts for hardware installation.

Installing the 2145-SV1 Node

Provides step-by-step procedures for installing support rails, the node in a rack, and cable management arms.

Chapter 3. Installing an optional 2 U SAS expansion enclosure

Chapter 4. Installing an optional 5 U SAS expansion enclosure

Safety and Physical Considerations for 2145-92 F

Covers safety notices, weight considerations, and component identification for the 2145-92F enclosure.

Installing the 2145-92 F Enclosure and Related Parts

Details unpacking, installing rails, enclosure, CMA, fascia, PSU, drives, modules, canisters, fans, FIB, SAS cables, and power.

Removing and Replacing 2145-92 F Components

Provides procedures for removing and replacing top cover, fascia, PSU, drives, modules, canister, fans, FIB, display, rails, SAS cable.

Chapter 5. Initializing the SAN Volume Controller 2145-SV1 system

Initializing System Using Technician Port

Guides the process of initializing the system by connecting to the technician port.

IBM MTM 2145-SV1 Specifications

General IconGeneral
Machine Type Model2145-SV1
TypeStorage Controller
ManufacturerIBM
RAID SupportRAID 0, 1, 5, 6, 10
Operating Temperature10°C to 35°C (50°F to 95°F)
Power SupplyDual redundant, hot-swappable power supplies
Host Interfaces8 Gbps Fibre Channel, 10 Gbps iSCSI
Drive InterfacesSAS

Related product manuals