Installation Preparation
‑16‑
T13 models
Figure 1‑3 General installation process (T13 models)
1.2 Installation Site Inspection
1.2.1 Environment
To give its performance full play and ensure a long service life, install the AC drive in
an environment specified as follows.
Table 1–1 Environment requirements
Item
Requirement
Installation Location Indoor
Grid overvoltage Overvoltage category (OVC) III