Installation Preparation
‑18‑
Figure 1‑4 Space for installation of one AC drive (T1 to T9 models)
● Installing multiple AC drives side by side
The AC drive dissipates heat upward. When multiple AC drives are required to
work together, install them side by side. Keep their tops level with each other,
especially for those of different sizes.
Figure 1‑5 Installing multiple AC drives (T1 to T9 models) side by side
● Installing one AC drive above another
Where up and down arrangement is necessary, the heat generated by the AC drive
below overheat the one above, leading to overtemperature/overload fault.
Therefore, an air guide plate must be installed, as shown in "
Figure 1–6 Installing
one AC drive above another
"
on page 19
.