EasyManua.ls Logo

Intergas XTREME 36 - Installing the Boiler

Intergas XTREME 36
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
5.3 Installing the boiler
1. Install the wall bracket.
2. Place the boiler: Slide the boiler from the top down, over the
wall bracket.
3. Remove the siphon cup.
4. You must fill the siphon cup just over half full with water.
5. Replace the cup. Install the flexible hose on the spout of the
siphon.
6. Connect the flexible hose of the siphon to a 19 mm solvent
weld pipe. To minimize the risk of freezing the condensate
pipe should be connected internally and terminate to an
internal sol stack (ref.: TB115 Gas Safe & HHIC).
7. Install the air supply duct and the flue (see §6.6).
COMMENT
The Intergas Xtremehas a boiler-specific
siphon cup. Ensure that the proper
version is ordered upon replacement.
(Item no 510054)
1. Assemble wall bracket
4. Fill siphon cup 5. Replace siphon cup in position and
attach flexible hose
6. Connect the flexible hose to the
sewer via an open connection.
2. Place boiler 3. Remove siphon cup
Open connection
to sewer

Table of Contents

Related product manuals