EasyManua.ls Logo

Intergas XTREME 36 - Domestic Hot Tap Water Facility; Gas Supply

Intergas XTREME 36
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
Connect the filling loop and fill the installation with clean
drinking water to a maximum pressure of 1-2 bar in the case
of a cold installation (Indicated on le display.)
Bleed the appliance with the manual bleed screw.
Bleed the air in the installation with the manual bleed
screws on the radiators.
Top up the CH installation if the pressure has dropped too
far as a result of the air bleeding.
Check all couplings for leakage.
Switch on the boiler by touching the control panel just
above the power LED and holding this for 2 seconds.
Put the boiler in operation using the room thermostat or
Service company (see §8.1.5) and check the operation.
Switch on boiler
2sec
Switch o boiler
2sec
Manual air vent
7.2.2 Domestic hot tap water facility
Open the mains tap to bring the domestic hot water section
under pressure.
Vent the changer and the piping system
by opening a domestic hot water tap.
Leave the tap open until all air has disappeared from the
system. Close the tap again.
Check all connections for leakage.
Vent the gas piping with the inlet pressure measurement
nipple on the gas valve.
Check all connections for leakage.
Check the inlet pressure and possibly the gas-air control;
see §8.9.
7.2.3 Gas supply
Inlet pressure
measurement nipple

Table of Contents

Related product manuals