Schedules
7.5 Schedules
01>Schedule 1
02 Schedule 2
Schedules are timed sets of actions with a weekly structure. Each schedule can
contain actions and action lists assigned to particular days of the week.
Schedule settings
7.5.n Select schedule
1>Name
Schedule 1
Select a schedule to program. There can be up to 4 schedules in the system.
Note: Only one schedule can be processed at a time. If there are more active
schedules on a particular date, the one with the highest number is processed.
For example, if schedules 2 and 4 are active, only schedule 4 actions are
executed.
7.5.n.1 Schedule name
1 Name
>Schedule 1 <
Every schedule can be programmed with a name to identify it.
Use the Schedule name screen to enter or edit the schedule name. Schedule
name can contain up to 16 characters.
7.5.n.2 Active
2 Active
>Off<
If set to On, the schedule is active.
7.5.n.3 Start date
3 Start [dd.mm]
>01.01<
Enter the first day of the schedule in DD.MM format.
7.5.n.4 Stop date
4 Stop [dd.mm]
>01.01<
Enter the last day of the schedule in DD.MM format.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Interlogix Advisor Advanced ATS 000A Series and is the answer not in the manual?

Interlogix Advisor Advanced ATS 000A Series Specifications

General IconGeneral
BrandInterlogix
ModelAdvisor Advanced ATS 000A Series
CategoryControl Panel
LanguageEnglish

Related product manuals