2-1A
MAIN FRAME ASSEMBLY: BEARING BLOCK/CLUTCH INSTALLATION
Socket Head Bolt, 3 x 8 mm
Socket Head
Bolt, 3 x 8 mm (4 pcs)
Socket Head Bolt, 3 x 40 mm
Nylon Lock Nut, 3 mm
Nylon Lock Nut, 3 mm (4 pcs)
Top Bearing Case
Flat Washer, 3 mm
Flat Washer, 3 mm (8 pcs)
.....................................4 pcs
...4 pcs
..................4 pcs
..................8 pcs
Threaded Rod, 3 x 50 mm
...4 pcs
*
*
Positon so that bearing faces upward.
Note:
Top Bearing Case Direction
Up
Prior to assembling the main
frames, sand all edges of the
frame using 120 grit sandpaper.
This will prevent wire chaffing
during continuous operation.
Note:
Cross Member, 32 mm
.....2 pc
Use Red
Threadlock
TEAM TIP: Don’t tighten bolts completely at this
time. These bolts will be tightened in Step 3-8 to
achieve proper alignment.
Socket Head Bolt, 3 x 40 mm (4 pcs)
Flat Washer, 3 mm (8 pcs)
Threaded Rod,
3 x 50 mm
*
*
*
*
*
*
Cross Member,
32 mm (2 pcs)
Re
d
Main Frame (2 pcs)