EasyManua.ls Logo

JR Vibe 90 3D - Assembly Process - Washout Unit; Assembly Process - Tail Slide Ring

JR Vibe 90 3D
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
71
Socket Head Bolt, 3 x 15 mm
Socket Head Bolt, 3 x 15 mm (2 pcs)
...............2 pcs
Flat Head Screw, 2 x 10 mm
Flat Head Screw,
2 x 10 mm (2 pcs)
..........................2 pcs
Flange Bearing, 3 x 8 x 4 mm
Flange Bearing, 3 x 8 x 4 mm (4 pcs)
.........................4 pcs
Washout Link Pin
Washout Link Pin (2 pcs)
Washout Link
..........................2 pcs
CA Stopper Ring, 2 mm
CA Stopper Ring, 2mm (4 pcs)
...................................4 pcs
Washer, 3 x 4.5 x 0.4 mm
Washer, 3 x 4.5 x 0.4 mm (2 pcs)
Washout Base
Washout Arm
...................................2 pcs
Spacer, 3 x 5 x 1.8 mm
Spacer, 3 x 5 x 1.8 mm
(2 pcs)
..................................2 pcs
Steel Joint Ball
Steel Joint Ball (2 pcs)
...............................2 pcs
P-5
ASSEMBLY PROCESS – WASHOUT UNIT
P-6
ASSEMBLY PROCESS – TAIL SLIDE RING
Tail Pitch Link Pin
Tail Pitch Link Pin (2 pcs)
Tail Pitch Link (2 pcs)
Tail Slide Ring Sleeve
Tail Slide Ring Collar w/Bearing
Tail Pitch Plate
.................2 pcs
Be sure to center pin
between pitch link ears
when installing.
Installing with four
moulded circle marks
in link facing in the
direction of arrow as
shown.
Tail slide ring sleeve is
reverse (left hand) thread.
Use caution when
installing.
Circle Marks

Table of Contents

Related product manuals