Socket Head Bolt
3 x 22 mm (2 pcs)
Nylon Lock Nut
3 mm (4 pcs)
2 pcs
Red
Flat Washer,
3 mm (2 pcs)
Flat Washer
3 mm (2 pcs)
Socket Head
Bolt, 3 x 8 mm (2 pcs)
R
ed
Aluminum Tail Support Clamp, Lower
5-8
HORIZONTAL/VERTICAL FIN INSTALLATION
Flat Washer, 3 mm
........................ 6 pcs
Socket Head Bolt, 3 x 22 mm
1 pc
Socket Head Bolt, 3 x 8 mm
............ 3 pcs
Socket Head Bolt, 3 x 6 mm
................ 2 pcs
Use Red Threadlock
Flat Washer
3 mm (4 pcs)
Socket Head Bolt, 3 x 22 mm
* Do not tighten completely.
Socket Head Bolt
3 x 8 mm (3 pcs)
Tail Case Support A (Thick)
Keep vertical.
Tail Case Support B (Thin)
4pcs
Red
Socket Head
Bolt, 3 x 6 mm (2 pcs)
Carbon Horizontal Fin
Flat Washer
3 mm (2 pcs)
Position the
horizontal
fin so that it is
level to the building
surface (90 to the
main rotor shaft)
and tighten the 2 tail
support clamp bolts
left loose in Step 5-5.
Carbon Vertical Fin
Flat Washer, 3 mm
........................ 2 pcs
Socket Head Bolt, 3 x 8 mm
............. 2 pcs
Use Red Threadlock
5-7
TAIL BRACE INSTALLATION
Socket Head Bolt, 3 x 22 mm
2 pcs
Red
Attach the 2 Tail Boom Braces to the model as
shown. The 2 front Plastic Tail Brace ends will need
to be heated and bent upward in the following step.
Once the Horizontal Fin Clamp has been attached to
the tail boom as shown, it will be necessary to heat the
2 Front Tail Brace Connectors using a High temperature
hair dryer or Model aircraft covering heat gun. Heating
these plastic connectors will help them to establish the
correct angle/shape for the current boom brace angles.
Nylon Lock Nut, 3 mm
..................4 pcs
For improved 3D performance and to reduce the
possibility for resonance Vibration, the Horizontal fin
can be shortened as shown prior to attachment.
Note:
Note:
Push up on the center of the boom
braces slightly when heating.
2 pcs
Red