EasyManua.ls Logo

JR Vibe 90 3D - Rotor Head Installation

JR Vibe 90 3D
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
4-1
SWASHPLATE ASSEMBLY
.............................4 pcs
Flat Head Screw, 2 x 10 mm
.................................4 pcs
....................................4 pcs
..........................3 pcs
Steel Joint Ball
Joint Ball Spacer, 2.75 mm
Use Red Threadlock
on all screws
Joint Ball
Spacer, 2.75 mm
Steel
Joint Ball
Flat Head Screw,
2 x 10 mm (4 pcs)
Joint Ball Spacer, 2.75 mm (4 pcs)
(note correct direction)
140/120 Aluminum
Swashplate Assembly
Steel Joint Ball (4 pcs)
140 CCPM Swash Type
Long Control Ball, 20 mm (2 pcs)
Short Control Ball,
4 mm (1 pc)
120 CCPM Swash Type
Short Control Ball,
4 mm (3 pcs)
Control Ball, 20 mm (140 CCPM)
Control Ball, 4 mm
...2 pcs
.....................................1 pc
Set Screw, 3 x 3 mm
If there is play between the upper and lower swashplate,
tighten set screw 3 x 3 mm to the lower of swashplate
little by little.
*CAUTION : Do not overtighten as binding and damage
to the bearing can occur.
Note:
Set Screw, 3 x 3 mm (3 pcs)

Table of Contents

Related product manuals