Do you have a question about the JUKI TR6SNR and is the answer not in the manual?
Brand | JUKI |
---|---|
Model | TR6SNR |
Category | Industrial Equipment |
Language | English |
Instructions for removing metal fixtures attached for transport.
Verifying the machine's voltage specification against the rating nameplate.
Steps for mounting the shuttle unit onto the machine's base.
Procedure for adjusting the machine's level using level vials.
Securing the shuttle unit and mounter using support parts.
Verifying the alignment of the picking pad of shuttle and X head.
Connecting the FG cable to the power cable for EN specification machines.
Instructions for installing the tray stacker accessory.
Detailed instructions on how to detach various covers of the machine.
Diagram showing the layout of electrical components in the standard configuration.
Diagram showing the layout of electrical components for CE-spec machines.
Procedure for replacing the machine's circuit protectors.
Steps for replacing the AC servo driver unit.
Guide for replacing the stepping motor driver units.
Instructions on how to replace the power lamp.
Steps for replacing the cooling fan motor.
Procedure for replacing the teaching spot component.
Replacing the main PCB for TR6SNR models.
Replacing the main PCB for TR6SNX/6SNV models.
Replacing the tray LED PCB, including optional components.
Diagram showing connector positions on the main PCB for TR6SNR.
Diagram showing connector positions on the main PCB for TR6SNX/6SNV.
Diagram showing connector positions on the SCN PCB.
Diagram identifying the sensors located in the Z unit.
Replacing and adjusting Z-axis origin and minus limit sensors.
Replacing and adjusting the ZM plus limit detection sensor.
Replacing and adjusting the sensor that detects the stacker set.
Replacing and adjusting the sensor for the stacker lock.
Replacing and adjusting the shutter sensor.
Diagram identifying the sensors located in the Y unit.
Replacing and adjusting Y-axis origin, minus, and plus limit sensors.
Replacing and adjusting the sensor for chuck detection.
Replacing and adjusting the tray pulled-out detection switch.
Diagram identifying the sensors located in the X unit.
Replacing and adjusting X-axis origin, minus, and plus limit sensors.
Replacing and adjusting the head ascent and descent sensors.
Diagram identifying the sensors located in the shuttle unit.
Replacing and adjusting shuttle origin, minus, and plus limit sensors.
Replacing and adjusting pad size and BGA sensors.
Replacing and adjusting the cover lock sensor.
Replacing and adjusting the standard cover interlock switch.
Replacing and adjusting the cover OPEN switch for CE machines.
Diagram identifying the door sensors.
Replacing and adjusting door lock and open sensors.
Replacing and adjusting door sensors for CE machines.
Replacing and adjusting the transfer sensor.
Replacing and adjusting the sensor for wrong tray insertion.
Replacing and adjusting the inspection transfer stop sensor.
Replacing and adjusting the origin sensor for automatic width adjustment.
Replacing and adjusting the IS unit antenna.
Diagram identifying the location of various motors on the machine.
Steps for replacing the Z-axis motor.
Steps for replacing the X-axis motor.
Steps for replacing the Y-axis motor.
Steps for replacing the shuttle motor.
Steps for replacing the conveyor motor.
Replacing the motor for automatic width adjustment (optional).
Replacing and adjusting the X-axis belt for TR6SNR/TR6SNX models.
Replacing and adjusting the Y-axis belt.
Replacing and adjusting the shuttle belt for TR6SNR models.
Replacing and adjusting the shuttle belt for TR6SER/TR6SNV models.
Replacing and adjusting the shuttle belt for TR6SNX models.
Replacing and adjusting the shuttle belt for TR6SXLX models.
Replacing and adjusting the transfer drive belt.
Adjusting the belt for transfer rail broadening/narrowing.
Replacing and adjusting the main transfer belt.
Diagram showing pneumatic components in the Y unit section.
Steps for replacing the tray chuck cylinder.
Replacing solenoid valves for shutter, tray chuck, and shuttle.
Replacing solenoid valves for shutter/tray chuck speed reduction (optional).
Diagram showing pneumatic components in the X unit section.
Steps for replacing the head cylinder.
Replacing the vacuum pad for the X-axis.
Replacing the solenoid valve for the X-axis.
Steps for replacing the X-axis ejector.
Steps for replacing the shuttle ejector.
Replacing the filter element in the ejector system.
Replacing solenoid valves for controlling head UP/DOWN speed (optional).
Diagram showing pneumatic components in the shuttle unit section.
Steps for replacing the BGA cylinder.
Adjusting the speed controller for the BGA cylinder.
Adjusting BGA cylinder speed controller for exhaust air.
Replacing the packing for the shuttle movable pad.
Steps for replacing the shuttle vacuum pad.
A list of all air components used in the machine.
The standard diagram of the machine's air piping.
The air piping diagram for the optional slow 2 mode.
How to start and exit the machine's test mode.
Procedure to initialize the machine's axes and sensors.
Performing checks on all machine sensors.
Testing the head suction valves and vacuum status.
Testing the shuttle suction valves and vacuum status.
Operating the head unit for testing purposes.
Operating the BGA holder for testing purposes.
Operating the Y holder for testing purposes.
Operating the shutter for testing purposes.
Operating the concentric nozzle for testing purposes.
Manual jogging control for the Z unit.
Selecting operating speeds for different functions.
The process of teaching component positions.
Entering component data and counts.
Executing predefined complex movement sequences.
Operating the X unit for testing purposes.
Operating the Y unit for testing purposes.
Operating the Z unit for testing purposes.
Operating the shuttle unit for testing purposes.
Adjusting the XY positioning of components.
Adjusting the conveyor for automatic width adjustment.
Operating the conveyor with automatic width adjustment.