EasyManua.ls Logo

KEEWAY ATV300 - Valve Stem Replacement

KEEWAY ATV300
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
6-6 Valve Stem Replacement
Heat up cylinder head to 100~150
with
heated plate or toaster.
Caution
Hold the cylinder head, and then press out old valve
guide from combustion chamber side.
Tool: Valve guide driver: 5.0 mm
Caution
Adjust the valve guide driver and let valve guide
height is in 13 mm.
Press in new valve guide from rocker arm side.
Tool: Valve guide driver: 5.0 mm
Wait for the cylinder head cooling down to room
temperature, and then correct the new valve guide
with reamer.
Caution
Correct valve seat, and clean up all metal residues from cylinder head.
Tool: Valve guide reamer: 5.0 mm
˙
˙˙
˙
Do not let torch heat cylinder head
directly. Otherwise, the cylinder head may
be deformed as heating it.
˙
˙˙
˙
Wear on a pair of glove to protect your
hands when operating.
˙
˙˙
˙
Check if new valve guide is deformation
after pressed it in.
˙
˙˙
˙
When pressing in the new valve guide,
cylinder head still have to be kept in
100~150
.
˙
˙˙
˙
Using cutting oil when correcting valve
guide with a reamer.
˙
˙˙
˙
Turn the reamer in same direction
when it be inserted or rotat
ed.
Valve guide reamer 5.0 mm

Table of Contents

Related product manuals