EasyManua.ls Logo

Keysight Technologies 34420A

Keysight Technologies 34420A
189 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5Service
130 Keysight 34420A Service Guide
Operating Checklist
Before returning your meter to Keysight Technologies for service or repair check
the following items:
Is the meter inoperative?
Verify that the ac power cord is connected to the meter.
Verify that the front-panel Power switch is depressed.
Verify that the power-line fuse is installed and not open (see page 28):
Use a 250 mAT, 250V fuse for all power line settings.
Verify the power-line voltage setting.
See “To Prepare the Meter For Use” on page 27.
Does the meter fail self-test?
Verify that the correct power-line voltage is selected.
See “To Prepare the Meter For Use” on page 27.

Table of Contents

Related product manuals