EasyManua.ls Logo

Keysight Technologies N5250C PNA Series

Keysight Technologies N5250C PNA Series
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Service Guide N5250-90001 6-15
Performance Tests and Checks
System Performance Verification
PNA Series Microwave Network Analyzer System
N5250A
Improving the Verification Results
IMPORTANT Inspect all connections. Do not remove the test port cable from the analyzer test
port. This will invalidate the calibration that you performed earlier.
1. Disconnect and clean the device that failed the verification measurement.
2. Reconnect the device making sure that all connections are carefully torqued.
3. Measure the device again using the previous calibration.
4. If the device still fails the verification measurement, repeat the full system verification process
including calibration.
Saving Verification Results
When you have a system verification result that represents the current performance of the
s
ystem, save the five resulting files to D:\sysver results.

Table of Contents

Related product manuals