12 Keysight E5071C ENA Series RF Network Analyzers
Installation
Checking the Shipment
2-
Checking the Shipment
After you receive the analyzer, carry out checks during unpacking according to
the following procedure.
Step 1. Check that the packing box or shock-absorbing material used to package the
analyzer has not been damaged.
Step 2. Check the packaged items supplied with the analyzer for any damage or
defects.
Step 3. By referring to the furnished contents list, check that all packaged items
supplied with the analyzer have been provided as per the specified options.
Step 4. After checking, if one of the following applies, contact your nearest Keysight
Technologies sales and service office.
1. The packing box or shock-absorbing material used to package the analyzer
has been damaged or the shock-absorbing material has traces where
extreme force has been applied.
2. A packaged item supplied with the analyzer has mechanical damage or
defects.
3. A packaged item supplied with the analyzer is missing.
4. A fault has been detected in the subsequent operation check of the
analyzer.
If an abnormality is detected in step 1, contact the company that transported
the analyzer as well as your nearest Keysight Technologies sales and service
office. For inspection by the transport company, save the packing box,
shock-absorbing material, and packaged items as you received them.
When unpacking the analyzer, if the external face of the analyzer (such as
the cover, front/rear panel, LCD screen, power switch, and port
connectors) appear to be damaged during transport, do not turn on the
power switch. Otherwise, you may get an electric shock.
If the packing box or shock-absorbing material has been damaged, leave
the packing box and shock-absorbing material as is until other inspection
items are checked as follows: