11
Keysight E5071C ENA Series RF Network Analyzers
Installation Guide
2 Installation
This chapter provides information about how to set up the Keysight E5071C.
Contents of this
Chapter
o “Checking the Shipment” on page 12
After you receive the analyzer, check all the items in the packing container.
o “Environmental Requirements” on page 13
Describes the system requirements needed to install the E5071C and how to
secure space for heat radiation.
o “Installing Front Handles/Rack Mounting Flanges” on page 16
Shows how to mount the front handles used to transport the E5071C and how
to install the flanges needed to install it in a rack.
o “Connecting the Accessories” on page 19
Provides information for connecting the mouse, keyboard, BNC adaptor to the
E5071C.
o “Power Supply” on page 20
Shows how to check the power supply as well as check and connect the power
cable.
o “Starting the E5071C” on page 22
Describes turning on/off of the Power switch and cutting off the power supply.
o “Initial Registration of E5071C” on page 26
Provides the procedure of initial registration for the Windows XP operating
system of the E5071C.