EasyManua.ls Logo

Kioti DS4110 - Adjustment of Lift Rod; OPERATION TIP for 3-POINT Hitch Elements

Kioti DS4110
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
-
5
3-POINT HITCH IMPLEMENT AND LOADER OPERATION
6
-
4
DS4110(HS) / DS4510(HS)
6
-
5
3-POINT HITCH IMPLEMENT AND LOADER OPERATION
6
-
4
DS4110(HS) / DS4510(HS)
H61O605A
H61O606A
OPERATION TIP FOR 3-POINT HITCH ELEMENTS
(3) Lift Rod (R)
(4) Check Chain
(1) Lift Rod (2) Lift Rod Turn Buckle
(3) Lock Nut
1. Adjust the implement balance by
turning the lift rod turn buckle.
2. After adjustment, secure it with the
lock nut.
(1) Top Link
(2) Lift Rod (L)
ADJUSTMENT OF LIFT ROD
(5) Lower Link
(6) Draw Bar
M50-EU-06.indd 4 2009-09-15 오전 9:51:06

Table of Contents

Related product manuals