Commissioning
33
Pos: 23.23 /Übersc hriften/Überschri ften 2/P-T/Sicherung der Transportstellung pr üfen @ 238\mod_13950451 22526_78.docx @ 1884194 @ 32 @ 1
8.8 Checking the Locking of the Transport Position
Pos: 23.24 /BA/Inbetr iebnahme/Erstinbe triebnahme/Abstan d Keil-Verriegelung_Bi ld_Swadro TC 880_TC 880 X- tr @ 238\mod_139504186 8249_78.docx @ 1883945 @ 3 @ 1
SW9000048
1
2
3
Fig. 13
Pos: 23.25 /BA/Inbetr iebnahme/Erstinbe triebnahme/Abstan d Keil-Verriegelung_ Text TC 880_TC 880 X-tr @ 238\ mod_1395041925712_7 8.docx @ 1883974 @ @ 1
– The machine is in transport position.
– The single-action control unit is pressurised.
– The tractor engine is switched off, the ignition key is removed and you carry it with you.
– Tractor and machine are secured against rolling away.
• Check dimension A; right and left sides of the machine
The dimension A between wedge (1) and locking (2) must be 2.5 to 3 mm.
Adjust the dimension A if it is not in the range between 2.5 to 3 mm.
To do this:
• Unscrew screws (3); move the wedge until the dimension is between 2.5 to 3 mm.
• Tighten screws (3).
Pos: 23.26 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1