Settings
100
Pos: 40.14.1 /Überschr iften/Überschr iften 2/A-E/AAushub verzögerung einste llen @ 243\mod_13957403268 36_78.docx @ 1906360 @ 2 @ 1
11.4 Setting the Lifting Delay
Pos: 40.14.2 /BA/Ei nstellungen/Schwader /Aushubverzögerung ei nstellen Seiten schwader_Bild @ 241\mod_13 95301795499_78.doc x @ 1897775 @ @ 1
1
SW9070125
Fig. 58
Pos: 40.14.3 /BA/Ei nstellungen/Schwader /Aushubverzögerung ei nstellen Seiten schwader_Text @ 243\mod _1395737998150_78.doc x @ 1906091 @ @ 1
The lifting delay of the rear rotor from working position to headland position and vice versa is
determined by the timing disc on the front outrigger arm.
The swivelling operations of the rotors from working position to headland position and vice
versa are determined via step sequence control on the front outrigger arm.
The lifting delay is set by adjusting the timing disc (1).
To do this:
• Loosen the screws of the timing disc (1).
• Move timing disc in the oblong holes.
Moving timing disc clockwise: Time delay will be increased.
Moving timing disc anti-clockwise: Time delay will be reduced.
• Tighten screws.
Pos: 40.15 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0. docx @ 4165 @ @ 1