Control box
30
Quantron S
Machine use
Example 3: Asymmetrical rhythms
- Press on function F2 (6).
- With a treatment width of 24 m, the control box
calculates the AS 6 rhythm (2)
Drilling starts with the rhythm in position 4 (3).
- Drilling start with the total seed drill width (4).
Tramlining
This menu is established to set the tramlining.
On headlands, the counting for the tramlining is only
possible if a continuous signal from the sensor is
emitted.
• Press Enter key.
• Indicate the time delay required after which the
tramlining counting is accepted.
Choice of where the signal comes from:
• ABS (3): The sensor on the chassis or on the coulter
bar counts the impulses for the tramlining counting.
A time delay of 2 to 5 is recommended.
-
• SPR (2): The side marker sensor controls the
tramlining counting.
The time delay can be set to 0.
- (4): Choice of tramlining correction on working screen.
See chapter Tramlining rhythm adjustment.
Select the field edge side to start drilling using
keys F3, F4 (5).