EasyManua.ls Logo

L-Acoustics A10 - Page 72

L-Acoustics A10
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging procedures
This step requires two operators.
Hold the enclosure by the handle until the rigging system is locked.
4. One by one, secure additional enclosures under the array.
Connect each enclosure on both sides before adding the next one.
SHLAK!
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
72 A10 owner's manual (EN) version 1.1

Table of Contents

Related product manuals