Rigging procedures
Flying an L2/L2D array with L2-SCREEN/L2D-SCREEN
Type of deployment flown array
Rigging accessories L2-SCREEN
L2D-SCREEN
Screws and fasteners 8 M4×40 and 16 M5×30 screws per screen (provided)
Tools electric screwdriver with torque selector
T20 Torx bit
T25 Torx bit
Min number of operators 2
Risk of falling objects
Verify that no unattached items remain on the product or assembly.
Additional safety for flown arrays
When flying an array, use available holes to implement a secondary safety.
The side panels block the access to the buttons and latches of the automatic locking system.
Strictly follow the sequence of successive steps in the procedure.
Prerequisite
Each L2 is unpacked and rests the right way
up on a stable flat surface.
Each L2D is unpacked and rests on its rear
side on a stable flat surface with a protective
mat.
See Securing L2/L2D on L2-CHARIOT/L2D-CHARIOT (p.86) for more
information on using L2-ROLL.
The selected main rigging element is secured
to the top enclosure.
See Flying an L2/L2D array with L2-BUMP and L2-BAR (p.97) or
Flying an L2/L2D array with L2-RIGBAR (p.107).
L2 owner's manual (EN) version 5.0 109