EasyManuals Logo

LG HN1639HC NK0 Installation Manual

LG HN1639HC NK0
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #81 background imageLoading...
Page #81 background image
81
ACCESSORIES INSTALLATION
ENGLISH
Central Controller
The product can communicate and control through the central controller.
The following functions can be controlled in the central control linked state (Operation/Stop,
Desired temperature, Hot water operation / stop, Warm water temperature, Full lock, Etc)
How to Install Central Controller
To use central controller, you need to establish an environment for mutual communication
between central controller and the this product and register the corresponding devices through
the functions of central controller.
To use central controller, it shall be installed in the following order.
Step 1. Installation environment inspection and device address setting
Before installing central controller, check the network for any interfacing devices and
assign non overlapping addresses to the connected devices.
Step 2. Connections
Connect Outdoor unit and central controller through RS-485 cable.
Step 3. Access and Device Registration
Log in to central controller and register device with address set.
Consult a qualified engineer/ technician for the installation of central controller.
If you have any installation queries, contact the LG service center or LG Electronics.

Table of Contents

Other manuals for LG HN1639HC NK0

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG HN1639HC NK0 and is the answer not in the manual?

LG HN1639HC NK0 Specifications

General IconGeneral
BrandLG
ModelHN1639HC NK0
CategoryHeat Pump
LanguageEnglish

Related product manuals