Service Training
TABLE OF CONTENTS
2 Linde electric fork truck E 20 / 25 / 30 Series 336 1
2.1 Drive - Motor 1
2.1.1 Traction motor to 6/95 1
2.1.2 Traction motor from 7/95 3
2.1.3 Checking and renewing the traction motor brushes 5
2.1.4 Traction motor disassembling 6
2.1.5 Fan 8
2.1.6 Speed sensor 8
2.2 Drive - Gearbox 1
2.2.1 Drive axle removal 2
2.2.2 Drive axle disassembly and assembly 4
2.2.3 Planetary hub reduction gearbox (from 1/95 to 5/95) 6
2.2.3.1 Removing the planetary hub reduction gearbox from the traction motor 6
2.2.3.2 Disassembly of the planetary hub reduction gearbox 6
2.2.3.3 Assembly of the planetary hub reduction gearbox 6
2.2.3.4 Installing the planetary hub reduction gearbox on the traction motor 7
2.2.4 Planetary hub reduction gearbox (from series 6/95) 8
2.2.4.1 Removing the planetary hub reduction gearbox from the traction motor 8
2.2.4.2 Disassembly of the planetary hub reduction gearbox 8
2.2.4.3 Assembly of the planetary hub reduction gearbox 8
2.2.4.4 Mounting the planetary hub reduction gearbox on the traction motor 8
2.2.5 Drive axle installation 10
2.3 Chassis 1
2.3.1 Seat switch 1
2.3.1.1 Renewing the seat switch 2
2.3.2 Cabin 3
2.3.2.1 Torsion bar springs 3
2.3.2.1.1 Removing and installing the torsion bar springs 4
2.4 Steering system 1
2.4.1 SteerIng axle 2
2.4.1.1 Steering axle removal 2