EasyManua.ls Logo

LNS Quick Load Servo 65 - Page 48

LNS Quick Load Servo 65
129 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3: PROCEDURES
QUICK LOAD SERVO 65/80
3-5
Step 8: After anchoring the unit, recheck the level and the alignment of the unit.
Step 9: fter the alignment has been rechecked, power will need to be hooked up to the bar feeder.
ading
Step 11: nt, load a bar into the loading table and verify that it can be loaded into the spindle of the
Note: If the bar hits side to side the alignment will have to be adjusted.
Procedure complete.
A
Step 10: Once the power has been hooked up, the bar feed must be calibrated. Refer to "Calibration of the Lo
Table" procedure. After calibrating the bar feed, return to this procedure and move on to Step 11 for the
final alignment.
For final alignme
lathe without hitting the sides of the spindle or spindle liner.

Table of Contents

Related product manuals