Chapter 8. Installation and Testing Operation
8-1
Chapter 8. Installation and Testing Operation
8.1 Installatin and Testing Operation
Communication module should be installed according to PLC CPU type and equip-able max. no. is
as follows according to CPU type.
[Table 8.1] Communication module equip-able according to CPU type
CPU
Type
Communication type
Equip-able
Max. no.
Slot location Reference
GM2 G3L-RUEA 4 Basic base I/O
G3L-RUEA 4 Basic base I/O GM3
K1000S
G3L-RREA 1 CPU location of basic
base
Remote I/O
G4L-RUEA 2 Basic base I/O
GM4
K300S
G4L-RREA 1 CPU location of basic
base
Remote I/O
G6L-RUEA 2 I/O GM6
K200S
G6L-RREA 1 CPU location of basic
base
Remote I/O
GM7 G7L-RUEA 1 Basic base I/O
8.1.1 Install Rnet I/F master module
1) In the types of master module, there are electric communication modules of G3L-RUEA, G4L-
RUEA, G6L-RUEA and G7L-RUEA. Communication module can be mounted up to 4 in GM1,
GM2, and GM3 PLC, and these can be mounted only in main base. When using the different
modules together, Rnet, Enet is included into 4 and Cnet is not included into 4.
2) Communication module can be mounted up to 2 in GM4, GM6 CPU (including Enet, except
Cnet) and up to 4 in GM4-CPUB, up to 8 in GM4-CPUC. (Commuication module can’t be
mounted in the extension base.)
3) Communication module can be mounted up to 1 in GM7 CPU (except Cnet, Profibus).