363-208-011, Appendix 3
Test Head Installation
Issue 1 November 1998 A3-3
NOTE:
Table 1-2 shows the usage of the test head circuit packs. POTS (plain old
telephone service) testing assumes MLT (Mechanized Loop Testing) and
special services testing assumes SARTS (Switched Access Remote Test
System) or its equivalent.
Table 1-2. Test Head Circuit Pack Usage
Step 5:
Verify whether the ED7C723-37, Group 30 cable assembly is required.
NOTE:
The Lucent Technologies cable assembly in Table 1-3 will be required if the
test head is connected to a
SLC
-2000 Access System Central Office Ter-
minal (COT) and several COTs are interconnected to share access to
SONET/DS1 timing. The ED7C723-37, Group 30 cable assembly is
required between J44 of the ARM shelf and P44 of the interbay cabling to
provide access to the test head.
Table 1-3. Lucent Technologies Cable Assembly
Card Description POTS Testing Special Services Testing
MPM Main Power Module X X
TCM Test Controller Module X X
WDM Wideband Digital Module X
WTM Wideband Transmission Module X
ATM Access and Termination Module X
VTM Voiceband Transmission Module X
VAM Voiceband Amplifier Module X X
AMM Analog Multimeter Module X X
Lucent Number Note Description
ED7C723-37, G30 MTAU Control to
SLC