2-14 Issue 4 February 1997
363-208-011
Installation Procedures
MDS Assembly Installation
NOTE:
The maximum number of MDS assemblies which can be installed in the
COT Bay is four. The first shelf must be located at the bottom of the bay
even if it is the only shelf provided.
NOTE:
The growth pattern for the MDS shelves is from the bottom up. Do not
leave any vacant spaces between or below the shelves. Only the first MDS
assembly will have a small space below its bay position. The baffle panel is
mounted between the second and third MDS and above the fourth MDS.
J1C265AE-1 MDS Assembly Mounting Procedure
Step 1:
Open the carton and inspect the shelf and all its connectors and cable
assemblies for damage or misalignment.
Step 2:
Mount the assembly and the required baffle panel, using its attached
hardware, to its designated bay position. Use the alignment pins (slotted
studs) to position the assembly.
Step 3:
Locate the ground strap attached to each assembly and connect it to the
bay frame as indicated in the Figure 2-5.
NOTE:
Remove any paint as necessary on the bay frame to ensure a
low-resistance contact.
Step 4:
Move the attached shelf cable assemblies forward so that they drape
into the bay frame’s cable duct areas. Leave the connectors in place at
this time for future connection to the Intrabay and Customer Interface
cable assemblies.
NOTE:
The following connectors on the shelf dangler cables should be
visible in their respective ducts as viewed from the rear:
Left Duct Right Duct
J302 P301
P500

Table of Contents

Related product manuals