Page 4 of 54 5100054 BND01O03.docx
10.2.
Substructure TS1524 (optional) 18
10.3.
Installation of Ceiling Column 18
10.4.
Installation of the Extension Arm 21
10.5.
Installation of the Spring Arm 22
10.6.
Assembly of the Injector Holder 23
10.7.
Installation of the Injector Holder 24
10.8.
Installation of Injector with Handle 25
10.9.
Cable Routing 26
10.10.
Installation of Connection Plate 28
10.11.
Installation Grounding Cable 29
10.12.
Adjusting the Spring Force 30
10.13.
Adjust the Upward Height Stop Point 31
10.14.
Adjusting the Rotation End-Stop at Axis A 32
10.15.
Adjusting the Friction Brakes 33
10.15.1.
Adjusting the Brakes for the Extension Arm 33
10.15.2.
Adjusting the Brakes for the Spring Arm 33
10.15.3.
Adjusting the Brakes for the Injector Column 33
10.16.
Installation/Disassembly of Extension Arm Covers 34
10.17.
Installation/Disassembly of Socket Covers 35
10.18.
Installation/Disassembly of Spring Arm Covers 35
10.18.1.
Front Spring Arm Cover Panels 35
10.18.2.
Decorative Spring Arm Covers ④ 36
10.18.3.
Rear Spring Arm Cover Panels ⑫ 36
10.18.4.
Cover Plates ⑦/⑯ 36
10.18.5.
Side Panels 37
10.19.
Installation of Canopy 38
11.
Maintenance 39
11.1.
Maintenance Check List 39
11.2.
Checking the Securing Elements for Axis B 42
11.3.
Checking the Securing Elements on the Spring
Arm 43
11.4.
Checking the Securing Ring at Axis A. 44