Operating instructions for a round-belt conveyor system with vertical conveyor RF with VF
File: BA_RFmitVF_9750655_EN_2017-05.docx Update: 2018-04-10 9750655
15/40
Design and construction subject to change without prior notice!
MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49 (0)781/203-0, Fax: +49 (0)781/203-1174
6.2.4 Working on the electrical equipment
Work on the electrical system must be conducted by a qualified electrician who complies
with the electrotechnical rules.
Disconnect the machine from the power supply before working on the electrical system
and before lifting the cover panels. To do this, turn the local mains switch to OFF and en-
sure that it cannot be switched back on again.
Attach all cover panels before putting the machine back into operation.
Check the electrical equipment regularly.
Tighten any loose connections.
Replace damaged lines/cables immediately.
Always keep the switch cabinet closed. Access is only permitted to authorised persons
with the key/tool.
Electrical parts, switch cabinets and other housings of electrical equipment must not be
sprayed with a water hose or high-pressure cleaner. (EN 60 335 and accident prevention
regulations-APR)
6.2.5 Before commissioning after maintenance and repair work
CAUTION!
Before commissioning, after maintenance and repair work:
Check tightness of any screw connections that have been loosened.
Ensure that removed sieves, protective screens and accident protection systems
have been re-installed.
After completion of maintenance or repair work and before re-commissioning the
round-belt conveyor, make sure that:
All materials, tools and other equipment necessary for performing the mainte-
nance or repair work have been removed from the installation's operating area.
Any liquids that may have escaped have been cleaned up.
All safety systems for the installation operate perfectly.
6.2.6 Observe environmental protection regulations
For all work on or with the machine, observe legal requirements relating to the avoidance
of waste materials and to their recycling/removal.
In particular, during installation, repair and maintenance work, materials that could pollute
water such as:
grease and oils
hydraulic oils
coolant
cleaning fluids containing solvents
must not be allowed to pollute the soil or enter the sewage system. These materials must
be stored, shipped, collected and disposed of in suitable containers.
6.3 Instructions tray infeed station
Please observe user instruction plates.