EasyManua.ls Logo

Meiko RF - Check that All Safety Equipment Is Working

Meiko RF
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating instructions for a round-belt conveyor system with vertical conveyor RF with VF
File: BA_RFmitVF_9750655_EN_2017-05.docx Update: 2018-04-10 9750655
23/40
Design and construction subject to change without prior notice!
MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49 (0)781/203-0, Fax: +49 (0)781/203-1174
10.2.4 Exit tunnel
The inspection flap on the exit tunnel of the vertical conveyor is secured with a safety switch
and two locks. During maintenance works and errors, the inspection flap can be opened
with a key.
The inspection flap may only be opened by a trained person.
10.3 Check that all safety equipment is working
In order to avoid damage to the installation, injury or death:
Prior to initial commissioning
Prior to re-commissioning after a lengthy period out of operation
Daily before starting work
sequentially check that all safety equipment is working properly.
All EMERGENCY STOP
switches
Height limitation switch
Pin limit switch
Control panel on vertical conveyor
CAUTION!