7 Assembly instructions (for a partially completed machine)
These apply where the MEIKO product is a partially completed machine according to the
Machinery Directive (Directive 2006/42/EC).
Please observe the following requirements when connecting MEIKO conveying technology
to an existing conveying system:
- The components must be aligned with one another, connected in an appropriate
manner, and fastened so that safe operation is assured. (The fastening options
are to be chosen in accordance with the locally available conditions).
- Dangers (e.g. drawing in, crushing, shearing or cutting) that could potentially
arise due to the fitting must be prevented appropriately.
- The electrical connection to the locally available supply grid, and any necessary
electrical connections, must be implemented in line with the enclosed wiring dia-
gram.
- During installation, make sure that you avoid damage, in particular to the electri-
cal installation.
- After completing the work, check the system for damage.
- The safety and functional tests must at the latest be carried out when the whole
system is tested.
- The system is supplied with slide rails to optimise the transition point where
applicable.
Working on the electrical equipment
The wiring diagram for the partially completed machine delivered contains all necessary opera-
tional shut-offs known to the manufacturer MEIKO, as well as other known, necessary shut-offs
and electrical connections. The connections are clearly indicated in the wiring diagram. Always
make sure that these connections are implemented prior to commissioning the machine, and that
they work reliably.
If any further unknown sources of danger that are not described by MEIKO arise due to connecting
system parts, you must eliminate them and, in some cases, this may mean that the machine
cannot be commissioned.