Meiko RF - 8 Delivery, Transport, Installation and Assembly; Delivery; Transport; Installation and Assembly

Meiko RF
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating instructions for a round-belt conveyor system with vertical conveyor RF with VF
File: BA_RFmitVF_9750655_EN_2017-05.docx Update: 2018-04-10 9750655
17/40
Design and construction subject to change without prior notice!
MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49 (0)781/203-0, Fax: +49 (0)781/203-1174
8 Delivery, transport, installation and assembly
8.1 Delivery
Check that the delivery is complete immediately after receiving it by comparing it with
MEIKO contract confirmation and/or the delivery note.
If necessary, submit a claim for any missing parts immediately to the freight forwarder and
notify MEIKO.
Check the entire installation for any damage that may have occurred during shipping.
Should you suspect any damage has occurred during shipping, you should inform:
The freight forwarder,
MEIKO
in writing, and also send a photo of the damaged parts to MEIKO.
8.2 Transport
CAUTION!
In order to avoid damage to the machine and life-threatening injuries when moving the
system, the following requirements must be observed:
- Transport work must be performed only by appropriately qualified persons observing the
safety instructions.
For safe transport, the machine parts are supported by a special square-timber frame.
The installation must be transported in on this timber frame by means of a pallet jack or
fork stacker.
- Please also read the chapter “general safety instructions”.
8.3 Installation and assembly
CAUTION!
MEIKO has prepared an installation drawing, according to your requests and ideas, show-
ing location, connected loads and energy consumption.
Installation and assembly work must be carried out as per the specifications on this instal-
lation drawing.
The conveying system must only be set up at the location intended in the installation draw-
ing using the intended feet or wall supports.
The equipment must be fastened to the floor so that it cannot be moved, particularly in the
pot wash area.
The installation area may only be changed with MEIKO's permission.
Should you wish to install and assemble the installation yourself, we would ask you to
request the comprehensive, detailed installation and assembly instructions.
In any case, the installation may be connected o n l y by technically competent personnel.
We do not accept any liability for damage caused by unprofessionally implemented con-
nection work.