SediGraph III 5120 Installation Installing the Analysis Program
Mar 2010 33
Installing the Analysis Program
Preparing Analysis Fluids
Insert the air filter in the drip tray. P F N/A
Level the analyzer. P F N/A
Place the PUMP CONTROL switch in the AUTO position. P F N/A
Place the SediGraph power switch in the ON position. P F N/A
Turn on the computer, monitor, and printer. P F N/A
Connect the power cable to the analyzer and to a power source. P F N/A
Turn the X-ray key to the X-ray ON position. P F N/A
Make sure the green light on the analyzer turns on. P F N/A
Make sure the fans are running. P F N/A
Allow the analyzer to warm up for 30 minutes before starting the
verification procedure.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Install the SediGraph analysis program and load calibration files. P F N/A
Start the analysis program. P F N/A
Procedure
Evaluation
Code
Initial/
Date
Make the proper solution of sodium metaphosphate and de-ionized water
and place in rinse container.
P F N/A
Insert the rinse, waste, and overflow tubes into the appropriate
containers.
P F N/A
Perform a baseline measurement. P F N/A
Procedure
Evaluation
Code
Initial/
Date