Installing the MasterTech 052 (Optional) SediGraph III 5120 Installation
34 Mar 2010
Installing the MasterTech 052 (Optional)
Verifying Operation
Procedure
Evaluation
Code
Initial/
Date
Remove the packing material. P F N/A
Select the line voltage. P F N/A
Install the fuse(s). P F N/A
Turn on the MasterTech. P F N/A
Install the beaker tray. P F N/A
Connect the cable from the SediGraph to the MasterTech. P F N/A
Install the ultrasonic probe. P F N/A
Install the sample transfer tubing. P F N/A
Procedure
Evaluation
Code
Initial/
Date
Test the SediGraph elevator assembly. P F N/A
Test the cell pump. P F N/A
Test the mixer pump. P F N/A
Test the air valve P F N/A
Test the waste valve P F N/A
Test the rinse valve P F N/A
Test the MasterTech operation (if installed). P F N/A