EasyManua.ls Logo

Micromeritics TriStar II 3020 - Page 50

Default Icon
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Operational Verification
4. Place the connector nut, ferrule, and O-ring onto the sample tube stem.
5. Attach the sample tube to the analysis port and ensure it is completely in the port. Securely
screw the connector nut onto the analysis port. Hand-tighten the connector nut.
6. Slide the dewar cover upward until it stops.
FILL AND INSTALL THE DEWAR
The equipment images in this document may differ slightly from your equipment, how-
ever the instructions are the same unless otherwise noted.
See also:
Dewar Precautions on page1 - 2
5 - 12
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) Sep 2017

Other manuals for Micromeritics TriStar II 3020

Related product manuals