6 INSTALLATION CHECKLISTS
Use these codes to complete the tables in this section, then initial and date each section. If the table
has an Initial / Date column, the person completing the procedure should enter their initials and the
date.
P Pass. Indicates that this procedure has been successfully completed without error.
F Fail. Indicates that this procedure has been unsuccessful and prevents the analyzer
from being installed for use.
Y Yes. Indicates that this procedure has been performed.
N No. Indicates that this procedure has not been performed.
N/A Not Applicable. Indicates that this procedure does not apply to your system.
Procedure
Evaluation Code
Review the Pre-installation Instructions and Checklist document and ensure
that the laboratory is prepared for installation.
P F N/A
Ensure that the required personnel are available. P F N/A
Ensure that all equipment has been unpacked and verified using the packing
list.
P F N/A
Analyzer is located in a suitable environment P F N/A
Line voltage has been verified to be within tolerances and changed if required. P F N/A
Prepare for Installation
6 Installation Checklists
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) — Sep 2017
6 - 1